1.Fed the dry mixture into the open hopper/ barrel of the shotcrete. To avoid clogging, provide liners on the chamber to lessen lumps of dry mixture.
2.With the control, allow the dry mixture to be blown by the compressed air into the spraying hose nozzle.
3.As the dry mixture pass the nozzle, control the separate water nozzle to hydrate the dry mixture with the right amount of water
4.In using the shotcrete, the nozzle should be far from the area with at least 0.6 meter to 1 meter.
5.The shotcrete operator should maintain the right amount of water to hydrate the dry mixture to achieve the compressive strength.
©China Mining&Construction Equipment Co., Ltd. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor:Zhang Wen