1, Before spraying machine downtime, stop feeding, no material to be ejected when the head office, shut the water supply valve.
2, While adding a small amount to wet sand hopper to the hopper and rotor material cavity rinse residual material.
3, Shotcrete machine to be no material spray nozzle at the time, turning off the motor power, turn off all gas line shut-off valve, and the control switch is closed
4, Spraying machine class should dismantle the discharge elbow, rotator rubber combination plate, remove the adhesive, demolition seat body, clears the body of excess material accumulated here and spraying machine body clean.
5, Feeding should be uniform, consistent with the spray operation, avoid crushing shaker phenomenon.
6, Prohibited by hand stirring gray material on the sieve.