1. Start the motor and the transmission gear starts to run. At this time, the brake belt on the reel is braked, and the brake lever on the large gear should be released, so that the reel does not rota
1. When the Rubber Paver Machine operates on a large slope (15%-20% vertical and horizontal slope), in order to prevent overturning, a heavy-duty tractor or bulldozer can be used if necessary, and the
1. All safety protection facilities on the rubber paver machine must be fully equipped. After the screed is lengthened, there should be corresponding safety protection measures. The width of the pedal
1. After the concrete cement mixer has finished discharging, immediately use the hose on the vehicle to drain the water to clean the feed inlet, discharge hopper and discharge chute, and remove the di
1. Before starting the cement mixer, the operating handle of the mixing drum should be placed in the "stop" position.
1. Part of the rubber paver machine is the daily technical maintenance, that is, the operator can reasonably keep the equipment, daily inspection, regular maintenance and correct operation and use of
©China Mining&Construction Equipment Co., Ltd. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor:Zhang Wen