ZLP800 Hanging Scaffolding is mainly used for the exterior construction, decoration and fitting-out works of multi-storey buildings such as the following: high rise elevator, cable way installation, granary, colliery, security inspection, tower hoist driver’s lift, welding of ship building, large tank, chimney, boiler maintenance, dam and bridge maintenance. The length can be up to 30 meters. ZLP800 Hanging Scaffolding is also applicable to exterior wall decoration, plastering,building insulation, coating, marble tile installation, glass curtain wall installation and cleaning. What’s more, we can design special platforms which can be used for special projects according to clients's demands
Model |
ZLP800 |
||
Rated load |
800Kg |
||
Lifting speed |
8-10m/min |
||
Platform Dimension L×W×H(mm) Spray plastics corrosion-resistant |
7500(2.5m*3)×720×1300 |
||
Lifting Height |
100 m |
||
Cable |
100 m |
||
Steel rope (specially-made) |
Ф9.1mm |
||
Hoist |
Pulling power |
6.17KN |
|
|
electric motor |
YEJ100L-4 |
YEJ90L-4 |
|
|
1.8KW*2 |
1.5KW*2 |
|
|
380V 50Hz |
380V 50Hz |
|
|
1420rpm |
1420rpm |
|
|
15Nm |
15Nm |
Safety lock |
Permission force of impact |
30KN |
|
|
Locking Cable Angle |
3°~8° |
|
Suspension mechanism (Galvanized ) |
Front beam overhang |
1.3~1.5m |
|
|
Support adjustable height |
1.44~2.14m |
|
Counterweight |
1000kg |
||
20’ft container |
8sets |
||
40’ft container |
13sets |
Your Name
Email or inquiry@chinacoalintl.com
Tel/Wechat/Whatsapp or +8618660761375
Country
Enquiry
©China Mining&Construction Equipment Co., Ltd. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor:Zhang Wen