1.Ground Material Mixing And Loading Station can achieve the automatic operation by PLC. It reduces the number of workers and the labor intensity, the whole material-mixing process is continuous and high-efficiency.
2.The sieving function can separate the useless large particles on the ground, which can avoid the waste of the transportation capacity when the waste materials are delivered to the underground. It can also reduce the risk of underground pipe plugging.
3.Ground Material-Mixing And Loading Station has automatic control which can make the materials-mixing ratio more accurate, reduce the rebound ration of the concrete spray, and improve the shotcreting strength.
No. |
ITEM |
UNIT |
PARAMETER |
1 |
Effective volume of the sand & gravel silo |
m³ |
2×4 |
2 |
Measuring accuracy |
_ |
±2% |
3 |
Proportioning period |
s |
≤60 |
4 |
Belt machine power |
Kw |
3×2.2 |
5 |
The volume of storage hopper |
m3 |
1.2 |
6 |
Machine weight |
kg |
2000 |
Your Name
Email or inquiry@chinacoalintl.com
Tel/Wechat/Whatsapp or +8618660761375
Country
Enquiry
©China Mining&Construction Equipment Co., Ltd. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor:Zhang Wen